ASG/Mobius ViewDirect
Proprietary archive formats with no open documentation, and an ageing web interface. Development has been minimal for years.
FileNet, CMOD, Content Manager and Datacap brought current, containerised, moved to cloud or consolidated onto IBM Content Cortex, with content clean, classified and suitable for direct use by AI.
Content Manager for iSeries, Content Manager, CMOD, FileNet Reports Manager and ASG/Mobius; FileNet Image Services in a 2017 case study.
MPS has delivered +50 upgrades of IBM content platforms before Content Cortex. The team that did them is the team you would be working with.
When a support date, a security finding or a data-centre exit is coming, we lay out the options in half a day and deliver the one you choose: the move onto Content Cortex, a straight upgrade on what you run, or a migration that stands on its own.
The team behind MPS has delivered large-scale ECM projects since the late 1990s, and today the upgrade we propose first is the move onto IBM Content Cortex. A straight upgrade on what you run is the other answer, and the assessment says which fits. MPS is an IBM Partner Plus Silver partner.
IBM’s reference example, from IBM’s deck: one APAC installation, before and after. The same workload, on containerised infrastructure.
Three master and eighteen worker nodes, replacing heterogeneous application servers, components and databases across two data centres.
Proprietary archive formats with no open documentation, and an ageing web interface. Development has been minimal for years.
Out of support since April 2019. Extended support is costly and limited, it is tied to AS/400 hardware, and the design caps you at eight metadata fields.
Discontinued after the FileNet acquisition and out of support for several years. It runs only on hardware, operating systems and databases that are themselves out of support.
Has changed owner three times and has not been a focus product since 2003. Proprietary structures that are hard to tune, with no open documentation.
Often on unsupported versions and hardware, with the original integrator no longer around.
Not every platform needs replacing. Where the product still has a future, the job is getting current and containerised. Content is cleaned on the way: deduplicated, repaired, with non-business content isolated and retention applied, which can reduce content size by up to 50% with deduplication and archiving. The upgrades we run:
IBM content platforms, in either direction, and the other systems archives come from. Metadata, annotations and links are kept, and the move runs in verified drops, checked by count and checksum, with every file compared by hash. The verification is a deliverable: a reconciled comparison of every file, signed off when the hashes match.
Exits from legacy report archives into CMOD, CMOD upgrades, and CMOD and Content Navigator on cloud, including the operating-system and database moves underneath.
A move into Content Manager OnDemand, from an older CMOD version, from FileNet Reports Manager or from ASG/Mobius ViewDirect, brings its own problems: large volumes and large individual files, value restrictions, format conversion, filename compatibility, metadata, and sometimes data read straight off the disks with no running system. CMOD upgrades bridge even the largest version jumps, from 7.x to current, on premises, containerised on OpenShift, AWS, Azure or another CNCF-certified Kubernetes, or onto IBM Content Cortex.
FileNet, CMOD and Content Navigator rebuilt on AWS, Azure or OpenShift, with the content moved and verified, then kept current, and moved again when the operating system, database or platform underneath reaches end of support. Case study: CM/400 to FileNet on the cloud.
Records management on FileNet and Enterprise Records, Content Navigator front ends and plug-ins, intake and bulk-upload services, workflows, integrations and governance.
AI is offered as a module with the upgrade or migration. It augments the deterministic migration and integration pipelines; it does not replace them.
A person settles the exceptions, with approval points and an audit trail around the critical steps.
We demonstrate the Content Cortex agent features on our own Content Cortex lab, on invented data. Ask for a demonstration.
A Content Cortex move is the one time when format conversion, data cleansing and legacy value remapping are already in scope, so content lands clean, classified and suitable for direct use by AI.
The case rests on four things, and how far each applies is exactly what the assessment measures:
Where those hold, payback inside three years is a realistic target, a number to establish against what you run rather than to assume.
A flow is assembled from connectors and steps: read, map, transform, write, check. Your old system stays in use while the history moves: new and changed content follows as deltas, and the two systems are kept in step until cutover, including over links that are slow, intermittent or satellite-backed. More on MPS Voyager.
We work in your time zone, from Singapore. Delivery is remote by default, with the team on site for the moments that need it, and local partners carry local-language support once the project lands.
Facing a Content Cortex move, or a platform past its end of support?
Half a day with your team, at no cost, with IBM experts where the work needs them: specific options and estimates for the upgrade, the migration or the cloud move.
Book a free assessment