Five steps, from a first look at what you run to a platform kept current.
Step by step
-
01
A free half-day assessment
You get specific options for your platform, each with an estimate of effort and time. It costs nothing.
We need half a day with your team, the platform and its version, and the date that is coming.
-
02
A health check, or one contained job
You get a paid, fixed-scope health check (versions, end of support, security findings, backups, a costed action list), or one contained job: a version upgrade, a redaction pilot or a Content Navigator extension.
We need access to the platform and someone who knows it.
-
03
The move, every file verified
You get the migration, archive exit or cloud move, run in verified drops, with metadata, annotations and links kept and every file compared by hash.
We need answers to our discovery questionnaire, or a site visit where needed, and the windows when your systems are free.
-
04
Managed support
You get response times agreed by severity, quarterly maintenance, a monthly report, and the platform kept patched, monitored and secure.
We need enhancements raised as change requests.
-
05
The next upgrade, planned in
You get an upgrade every one to two years, planned before the end of support rather than after it.
We need a window agreed with you in advance.
How long it takes
- 1–3 months
- a proof of concept
- 3–9 months
- a pilot project
- 6–18 months
- an infrastructure project
Typical, not promised. Each project is priced after discovery.
Who you work with
MPS leads from Singapore, with CSHARK's engineers behind it. One team is accountable to you, remote by default and on site when the work needs it. CSHARK is ISO 27001 certified by DEKRA.
Contracted as professional services and R&D, managed services and support, programme and project management, or team augmentation. Most clients stay on managed support after the move.
What drives a migration estimate
Volume, document size and type, the source and target systems, and their operational windows; then delta migration, compliance, conversion, taxonomy and workflow, and connected systems. The plan covers data quality, performance, backup and recovery, access, testing, compliance, cost, management, and what comes after the move.